水穩(wěn)砼的養(yǎng)生是怎么個(gè)情況?

來(lái)源:http://id888.com.cn/ 日期:2023-01-28
濟(jì)南水穩(wěn)砼既是保證水泥穩(wěn)定碎石(砂礫)強(qiáng)度的需要,又是減少和避免干縮裂縫的措施。因此,每一段底基層碾壓完成并經(jīng)壓實(shí)度檢測(cè)合格后,應(yīng)立即開始養(yǎng)生,養(yǎng)生宜采用不透水薄膜、濕砂、草袋、棉毯覆蓋并灑水保濕養(yǎng)生。
Jinan water stabilized concrete is not only the need to ensure the strength of cement stabilized crushed stone (gravel), but also the measure to reduce and avoid dry shrinkage cracks. Therefore, after each section of subbase is rolled and passes the compactness test, the curing should be started immediately. The curing should be covered with impermeable film, wet sand, straw bag, cotton blanket, and watered for moisturizing.
基層完成后要及時(shí)交給路面施工單位,進(jìn)行瀝青乳液養(yǎng)生,避免基層長(zhǎng)期暴曬。養(yǎng)生期不宜少于7天,并應(yīng)封閉交通,除灑水車輛外,嚴(yán)禁其它車輛通行。基層過(guò)冬時(shí),應(yīng)采取覆蓋保溫措施,以防止基層開裂或表面受損可采取先鋪塑料薄膜后覆蓋粘土的措施,減少和避免因溫差過(guò)大時(shí)產(chǎn)生溫縮裂縫。
After the base course is completed, it shall be timely delivered to the pavement construction unit for asphalt lotion curing to avoid long-term exposure of the base course. The curing period should not be less than 7 days, and the traffic should be closed. Except for the watering vehicles, other vehicles are not allowed to pass. During the winter of the base course, the thermal insulation measures shall be taken to prevent the base course from cracking or surface damage. The measures of first laying plastic film and then covering clay can be taken to reduce and avoid temperature shrinkage cracks caused by excessive temperature difference.
水穩(wěn)砼攤鋪后,當(dāng)水穩(wěn)砼的含水量等于或略大于佳含水量時(shí),應(yīng)及時(shí)根據(jù)試驗(yàn)段確定的碾壓工藝,用輕型壓路機(jī)并配合20T以上壓路機(jī)在結(jié)構(gòu)層全寬內(nèi)進(jìn)行碾壓。碾壓段長(zhǎng)度根據(jù)試驗(yàn)段確定的長(zhǎng)度及氣溫情況確定,氣溫高時(shí),水分蒸發(fā)快,縮短碾壓段長(zhǎng)度,反之,可適當(dāng)延長(zhǎng)碾壓段長(zhǎng)度,以40-50米為宜,過(guò)短則易造成平整度較差。
After paving the water stabilized concrete, when the water content of the water stabilized concrete is equal to or slightly greater than the optimum water content, the light roller shall be used in time according to the rolling process determined in the test section, and the roller above 20T shall be used for rolling within the full width of the structural layer. The length of the rolling section is determined according to the length determined by the test section and the temperature. When the temperature is high, the water evaporates quickly and the length of the rolling section is shortened. On the contrary, the length of the rolling section can be appropriately extended, preferably 40-50 meters. If it is too short, it is easy to cause poor flatness.
濟(jì)南水穩(wěn)砼
碾壓方式初壓一般采用膠輪壓路機(jī)或鋼輪壓路機(jī)靜壓1-2遍,復(fù)壓采用振動(dòng)壓路機(jī)弱振強(qiáng)度2-4遍,終壓采用鋼輪壓路機(jī)或膠輪壓路機(jī)靜壓1-2遍,碾壓速度初、終壓宜為1.5-1.7Km/h,復(fù)壓宜為2.0-2.5Km/h,直線和不設(shè)超高的平曲線段,由兩側(cè)路肩向路中心碾壓,設(shè)超高的平曲線段,由內(nèi)側(cè)路肩向外路肩進(jìn)行碾壓。
Rolling method: the initial rolling shall be carried out by rubber wheel roller or steel wheel roller for 1-2 times, the re-rolling shall be carried out by vibratory roller with weak vibration strength for 2-4 times, the final rolling shall be carried out by steel wheel roller or rubber wheel roller for 1-2 times, the initial and final rolling speed shall be 1.5-1.7Km/h, the re-rolling speed shall be 2.0-2.5km/h, the straight line and the flat curve section without superelevation shall be rolled from the shoulders on both sides to the road center, and the flat curve section with superelevation shall be set, Rolling shall be carried out from the inner shoulder to the outer shoulder.
碾壓時(shí),輪跡應(yīng)重疊1/2輪寬。相鄰兩段的接頭處,應(yīng)錯(cuò)成橫向45°的階梯狀碾壓。嚴(yán)禁壓路機(jī)在已完成或正在碾壓的路段上“調(diào)頭”和急剎車。自拌和至碾壓結(jié)束原則控制在2h以內(nèi)。您對(duì)該產(chǎn)品還有什么問(wèn)題或者需求都能隨時(shí)來(lái)我們網(wǎng)站http://id888.com.cn做咨詢!
When rolling, the wheel track shall overlap 1/2 wheel width. The joints of the two adjacent sections shall be staggered into a 45 ° transverse stepped rolling. It is strictly prohibited for the roller to "turn around" and brake sharply on the road section that has been completed or is being rolled. From mixing to rolling, it shall be controlled within 2h in principle. If you have any questions or needs about this product, please come to our website at any time http://id888.com.cn Consulting!
  • 上一條:土的含水量對(duì)壓路機(jī)壓實(shí)過(guò)程的影響
  • 下一條:提高路面機(jī)械設(shè)備工作穩(wěn)定性的措施
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    熟妇人妻老色视频网站| 亚洲AV中午一区二区三区| 欧美日韩精典免费观看| 亚洲第一成人网站| 国语精品在线一区二区| 美女高潮黄又色高清视频免费| 亚洲成a人片| 99爱精品视频| 国产综合在线高清| 国产精品久久无码一区AV | 成人在线免费免费| 678五月丁香在线亚洲综合网| 国产欧美久久久久久久久| 六月份停停色网| 国产在线p| 波多野结衣AV无码中文无码 | 污在线观看www.| 欧美欧美伦院在线观看| 东京热人妻一区二区三区| 最新髙清无码在线观看| 亚洲香美视频| 一二三四五在线免费高清无码| 97人人模人人爽人人喊谢绝| 久久99精品国产女不卡| 久久久久亚洲国产AV麻豆| 五月丁香开心网| 久久久久亚洲AV成人网人| 国产视频一区二区在线播放| 久久精品一区日韩| 日本三级伊人久久人妻| 精品一区二区搞基| 国内精品久久久久久久软件| 六月亭亭网| 欧美激情综合在线| 中国一级做a爰片久久毛片| 国产精品一级二级三级视频| 九九日精品| 中文资源在线天堂库8| AV无码午夜福利一区二区三区 | 亚洲成AV人片一区二区国产| jiuse九色最新地址|