欧美日韩国产一区二区三区,丝雨群交网站,国产91不卡,男女日皮免费专区

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

水泥穩(wěn)定碎石施工采用什么施工工藝

來源:http://id888.com.cn/ 日期:2022-09-30
濟南水泥穩(wěn)定碎石施工采用什么施工工藝呢?實際上會采用商品水穩(wěn)(預(yù)拌),用機械攤鋪、壓路機碾壓的施工工藝。下面詳細(xì)講下:
What construction technology is used in Jinan cement stabilized macadam construction? In fact, the construction technology of commercial water stabilization (premix), mechanical paving and roller rolling will be adopted. Let's talk about it in detail:
1、原材料基本要求普通硅酸鹽水泥、礦渣硅酸鹽水泥、火山灰質(zhì)硅酸鹽水泥都可以用于水泥穩(wěn)定碎石路面基層施工,禁止使用快硬水泥、早強水泥以及其它受外界影響而變質(zhì)的水泥。
1. Basic requirements for raw materials Ordinary Portland cement, slag Portland cement and pozzolanic Portland cement can be used for the construction of cement stabilized macadam pavement base. Fast hardening cement, early strength cement and other cement deteriorated by external influence are prohibited.
路面基層宜采用強度等級較低的水泥;水泥各齡期強度、安定性等應(yīng)達(dá)到相應(yīng)指標(biāo)要求;要求水泥初凝時間3小時以上、終凝時間不小于6小時。
Cement with lower strength grade should be used for pavement base course; The strength and stability of cement at each age shall meet the corresponding index requirements; The initial setting time of cement shall be more than 3 hours and the final setting time shall not be less than 6 hours.
2、水泥穩(wěn)定碎石施工前準(zhǔn)備
2. Preparation before construction of cement stabilized macadam
①本工程水泥穩(wěn)定碎石基層的下承層為水泥穩(wěn)定土基層,水泥穩(wěn)定碎石攤鋪須在水泥穩(wěn)定土達(dá)到規(guī)定的強度、平整度、拱度等基礎(chǔ)上,經(jīng)驗收后,才能進行攤鋪。
① The lower bearing layer of the cement stabilized macadam base course of this project is the cement stabilized soil base course. The cement stabilized macadam can only be paved after the cement stabilized soil reaches the specified strength, flatness, camber, etc.
②恢復(fù)中線。每10~15m設(shè)置一樁,用指示樁標(biāo)出攤鋪寬度。
② Restore the center line. One pile shall be set every 10~15m, and the paving width shall be marked with an indicator pile.
③進行水平測量。在每一斷面上設(shè)置3個指示樁(即中心樁、左側(cè)邊樁和右側(cè)邊樁),用明顯標(biāo)記標(biāo)出水泥穩(wěn)定碎石基層松鋪厚度和設(shè)計高程。
③ Carry out level measurement. Set 3 indicator piles (i.e. center pile, left side pile and right side pile) on each section, and mark the loose paving thickness and design elevation of cement stabilized macadam base with obvious marks.
濟南水泥穩(wěn)定碎石
④培肩。為減少水泥穩(wěn)定碎石混合料在碾壓過程中的側(cè)向位移,保證水泥穩(wěn)定碎石壓實度,采取培肩措施,培肩上口寬50cm下口寬70cm,高度不小于水泥穩(wěn)定碎石壓實厚度。為保證雨天排水,可每隔5~10m開挖臨時排水溝。
④ Shoulder training. In order to reduce the lateral displacement of cement stabilized macadam mixture during rolling and ensure the compactness of cement stabilized macadam, shoulder training measures are taken. The width of the upper opening of the shoulder is 50cm and the width of the lower opening is 70cm. The height is not less than the compacted thickness of cement stabilized macadam. To ensure drainage in rainy days, temporary drainage ditches can be excavated every 5-10m.
⑤施工前須詳細(xì)計劃安排,盡量減少橫向接縫,避免縱向接縫。
⑤ Before construction, detailed planning and arrangement shall be made to minimize transverse joints and avoid longitudinal joints.
水泥穩(wěn)定碎石施工采用什么施工工藝?以上就是問題的相關(guān)解答了,您對此有什么想法或者問題咨詢,都能來我們網(wǎng)站http://id888.com.cn咨詢!
What construction technology is used for cement stabilized macadam construction? The above is the answer to the question. If you have any ideas or questions, please come to our website http://id888.com.cn consulting service
  • 上一條:修路用的瀝青到底是什么
  • 下一條:路面機械設(shè)備的維護與保養(yǎng)
  • 相關(guān)產(chǎn)品:

    999一区| 六月丁香综合激情| 国产在线欧美日韩精品一区 | 国产成人无码91精品一区| 精品国产一区二区三区香蕉91| 免费看青草视频在线| 日日摸夜夜添无码专区视频 | 91第一页第一区| 99夫妻福利视频| 久久91精品久久久久久9鸭 | 国产免费久久无码精品一区| 久久怡红院影院| 中文字幕 国产在线| 五月丁香激情综合五月| 操av社区| 日本中文字幕www| 91av免费| 涩精品 XXXX| 91无码精品人妻一区二区三区| 丰满岳乱妇一区二区三区电影| 国产香蕉尹人在线视频播放 | 精品h动漫中文无遮挡在线| freesex顶级少妇hd性欧| 狠狠色综合欧美激情| 麻豆视频一区二区不卡| 字幕视频一区二区中文| 日韩黑人在线| 高清无码v视频| 伊人久久大香线蕉在观看| 国产伦精品一区二区三区免费迷| 五月丁香综合w| 国产最新精品一区二区三区喷奶水 | 熟女乱淫aaaa片久久| 国产成人老| 日本真人xXX在线看| 男女男精品网站| 亚洲性日韩一区二区三区| 日本高清色视频www| 亚洲视频高清性色| 丁香香蕉视频| 欧美亚洲几页|